News Banner Img
The Operational Readiness Consultant supports the readiness effort through the EPC-to-O&M transition of Hai Long and helps establish the Operational Control Centre OCC. The focus is to confirm the wind farm is ready to operate, tested against fixed pass/fail criteria and evidence, before it transfers from the EPC contractor to O&M. Alongside that, the OCC moves from a temporary commissioning setup to a permanent in-house control centre that will operate the windfarm for thelife of the windfarm.
This is a fixed-term mobilisation appointment reporting to the O&M Manager, based full time in Tapei, Taiwan.